Lockheed Martin invested $350 million to build the most advanced satellite manufacturing facility in company history. The new Gateway Center in Littleton, CO is 266,000 square feet and includes a high bay clean room, and separate Thermal Vacuum Chamber and Anechoic Chamber Icons.
Retained by Hensel Phelps Construction Company, Lerch Bates provided Design Phase Consultation including Technical Peer Reviews, Hygrothermal Analysis and 2-D THERM Modeling, BECx Plan Development, Shop Drawing & Submittal Reviews, Enclosure System QC Checklists, Field Mock-Up Testing, On-Site Quality Assurance Observations, Metal Panel Field Performance Testing via ASTM E783 and ASTM E1105, and AAMA 501.2, and a Final BECx report.
Lockheed Martin
Mission Critical / Data Centers
266,000 Sq Ft
Hensel Phelps Construction