Washington Monument Renovation


华盛顿特区

Washington Monument Elevator Project

Washington Monument Renovation

下载项目 PDF

想了解更多关于这个项目的信息吗?

让我们谈谈

关于这个项目

On August 23, 2011, a 5.9 magnitude earthquake hit the DC metropolitan area and caused considerable damage to the monument. It was closed and after $15 million in repair work, it was reopened only to be closed again in 2016 after an elevator cable snapped. Lerch Bates was called upon to use our expertise to replace the outdated elevator. Teaming with Delaware Elevator, we wrote specifications for the new elevator along with a new programmed operating system for the elevator. It enables the elevator to be used without an attendant and also slows as the elevator descends to show the “state stones” in the inside of the monument.
调查维修+现代化垂直运输政府历史性

乍看上去

客户

National Park Service | Jacobs Engineering

项目规模

55 square ft (base) 554 ft high

完成日期

09-2019